Use these controls to simulate grid and telecom failures. These prove the Edge Controller operates safely and shuts down exports instantly.
Trigger a step-by-step diagnostic verification audit of the local gateway failsafe routing mechanism. This will test anti-islanding relay decoupling times, feeder transformer reverse-flow margins, Modbus zero-export overrides, and cellular outage fallback countdown leases.
| Timestamp | Sensor / Feeder | Trigger Fault Event | Relay Action / Latency |
|---|---|---|---|
| 2026-05-29 14:10:05 | FEEDER-3B-LAG | Grid Over-Frequency (52.1 Hz) | TRIP DECOUPLED / 22ms |
| 2026-05-28 08:34:12 | FEEDER-3B-LAG | Grid Under-Voltage (170V RMS) | TRIP DECOUPLED / 35ms |
| 2026-05-15 11:02:44 | FEEDER-3B-LAG | Grid Loss / Zero Voltage Detected | TRIP DECOUPLED / 17ms |